Download | March 5, 2013

Case Study: Urgent Tech Transfer

Source: Patheon Inc.

The Solution: Due to the deteriorating situation with the other CMO, the timeline for the tech transfer was extremely short. Patheon provided a dedicated tech transfer team that worked as one with the customer to execute each aspect of the project: validation of the non-compendial analytical methods, transfer of the manufacturing process, equipment design and qualification, process validation batches manufacturing, and a stability study on the drug product.

For full access to this content, please Register or Sign In.

Access Content Case Study: Urgent Tech Transfer