Case Study

A Mobile BSL-2 cGMP Cleanroom Delivered In Less Than 3 Weeks

Source: Germfree
mobile-bsl-2-cgmp-cleanroom-study

Germfree was tasked with providing a mobile cleanroom facility for the manufacturing of a new monoclonal antibody product for phase 1 clinical trials. The facility needed to meet BSL-2 and cGMP requirements and have the potential for future repurposing. The project included a 450 sq. ft size and a 3-room layout, equipped with biosafety cabinets, laminar flow hoods, and pass-through boxes.

The main challenge was to deliver the cleanroom within a tight deadline of less than 3 weeks. However, Germfree was able to modify their standard mobile laboratory platform to meet the specific requirements of the project. The facility was successfully completed within the given timeline and was utilized for the development of a therapeutic for COVID-19. Germfree believes that the mobile cleanroom will continue to be valuable for future clinical trials.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Pharmaceutical Online? Subscribe today.

Subscribe to Pharmaceutical Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Pharmaceutical Online