Case Study

GMP Manufacturing Cycle Time Reduction

Source: CAI
GettyImages-2173467618-vials-conveyor-belt

Variability in Time Between Batches (TBB) is a silent productivity killer in GMP manufacturing. When a major pharmaceutical facility faced inconsistent execution and limited visibility into process constraints, the solution required more than just faster work; it demanded a structural shift. By applying a data-driven Operational Excellence framework, the facility identified specific bottlenecks, such as redundant robot line clearances and outdated standard operating procedures.

The intervention led to a 36% reduction in TBB duration and, perhaps more importantly, a 49% decrease in variability. This approach proves that utilizing the DMAIC problem-solving framework to analyze inter-batch manual operations can yield record performance results. Download the full case study to explore the specific methodologies used to achieve these operational gains.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Pharmaceutical Online? Subscribe today.

Subscribe to Pharmaceutical Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Pharmaceutical Online