Article | April 18, 2023

Key Cleanroom Design Considerations For Drug Manufacturing

Source: Germfree

By Carol Houts

When designing and constructing a cleanroom, there are several options available. Each construction method has its pros and cons, and the choice ultimately depends on factors such as budget, timeline, customization requirements, and overall project goals. Modular panel wall construction offers adaptability, quick construction, and quality control, while stick-built construction provides greater customization and potentially lower initial costs. Prefabricated offsite built cleanrooms emphasize quality control, operational certainty, speed of construction, and reduced onsite disruption.

Compare and contrast these factors to determine the most suitable approach for your specific cleanroom project.

access the Article!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Pharmaceutical Online? Subscribe today.

Subscribe to Pharmaceutical Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Pharmaceutical Online