Key Cleanroom Design Considerations For Drug Manufacturing
By Carol Houts
When designing and constructing a cleanroom, there are several options available. Each construction method has its pros and cons, and the choice ultimately depends on factors such as budget, timeline, customization requirements, and overall project goals. Modular panel wall construction offers adaptability, quick construction, and quality control, while stick-built construction provides greater customization and potentially lower initial costs. Prefabricated offsite built cleanrooms emphasize quality control, operational certainty, speed of construction, and reduced onsite disruption.
Compare and contrast these factors to determine the most suitable approach for your specific cleanroom project.
Get unlimited access to:
Enter your credentials below to log in. Not yet a member of Pharmaceutical Online? Subscribe today.