Facility Design
-
Biopharma Resilience: Bionova Scientific Talks Capacity, Speed, And Agility
10/7/2022
Bionova Scientific shares how a CDMO can offer biopharma companies the flexible capacity they need to meet the growing needs for medicines today and in the future.
-
How To Best Optimize mRNA Production Workflows
4/11/2023
Multiple steps in the mRNA manufacturing process can appear more complex than they have to be. Learn how to simplify your approach and produce the best possible mRNA vaccines and therapeutics.
-
Time And Cost Savings Of Modular Cleanrooms Vs. Stick Built Cleanrooms
6/30/2021
While using drywall may seem like it can save you money on your cleanroom project at first glance, you can save money over the life cycle of your cleanroom with modular construction.
-
The Evolution Of Pharmaceutical Modular Cleanroom Technologies And Project Execution
10/22/2020
AES Clean Technology is expediting the delivery of fully functioning cleanrooms. Modular technology allows for repeatable installations of proven systems. New facility projects are time consuming and have thousands of decision points. AES has simplified this process offering standardization. The three models AES offers have taken into consideration the trends seen with modern facilities offering built-in flexibility. AES is also capable of working collaboratively with clients to design–build high-quality customized cleanroom systems with guaranteed performance.
-
Importance Of Architectural Layout To Prevent Contamination
8/21/2025
In this segment from the Pharmaceutical Online Live event, “Contamination Control Strategies For Drug Manufacturers,” panelists discuss the importance of unidirectional flow for preventing contamination, as well as specific architectural requirements related to the European Union's Annex 1 regulations. Poor or aging facility design is not an acceptable excuse for noncompliance.
-
AES Compass™ Cleanroom Facility Programming Video
3/8/2021
AES Compass is a conceptual planning program that helps you identify the critical parameters of your cleanroom project ahead of the design process, ensuring that your facility will be completed on-time and on-budget with minimal delays and disruptions.
-
Addressing Rapid Biomanufacturing Capacity Needs
10/21/2022
Adapt to evolving biomanufacturing demands and rapid capacity needs with a KUBio™ box environment, KUBio™ modular facility and integrated FlexFactory™ configurable manufacturing train.
-
Modular Facilities - The Proven Response For Rapid Biomanufacturing Anywhere
9/28/2021
Select one of the flexible, prefabricated cGMP biomanufacturing environment with a configurable production line that future-proofs capacity expansion, improves operational efficiency and minimizes infrastructure to begin manufacturing faster for a fraction of the cost.
-
Best Practices For Cleanroom Project Delivery And Construction
10/24/2019
By offering cleanroom design, manufacturing, and construction, we provide a complete cleanroom project delivery with guaranteed performance.
-
Cleanroom Partnership Showcase: Avid Bioservices
1/13/2022
With a cleanroom design and construction partnership spanning decades, our teams have collaborated over the years to produce innovative modular cleanrooms that meet the needs of Avid’s clients.