Critical Environments Multimedia
-
Successfully Implementing A Cleanroom Facility Monitoring System
10/31/2021
After deciding on a cleanroom Facility Monitoring System (FMS) it is time to implement it. Many things can go wrong. Review some possible roadblocks and how our team prepares for a successful FMS implementation.
-
Deliver Contamination Control Solutions To An AUSTAR Customer
10/31/2021
In this video interview, the team from AUSTAR UK discuss why and how they worked with Particle Measuring Systems’ (PMS) exclusive UK distributor, EMS Particle Solutions, to provide an AUSTAR Sterility Test Isolator customer with a complete viable and non viable contamination monitoring solution using PMS instrumentation and equipment.
-
T-FIT Insulation Installation Guide
10/20/2021
See how quick and easy you can install this insulation solution with the minimum of fuss, tools and disruption.
-
T-FIT: Leading High Performance, High-Quality, Longest Lasting Technical Insulation Solution
10/20/2021
T-FIT outperforms all competitor materials making it the most effective insulation for plant wide installation.
-
SP i-Dositecno EVW-100 External Vial Washer
10/5/2021
Compact in-line vial decontaminating machine designed to rinse pharmaceutical vials.
-
Data Quality - The Journey Of The Data Management Life Cycle
9/30/2021
Sometimes we focus on data while forgetting how poor practices, bad decisions, incorrect definitions, and lack of evaluations effect the outcome. In this webinar, we analyze how to go from “data” to “data quality” to improve your overall contamination control strategy.
-
Replacing Settle Plates With Active Air Sampling
9/30/2021
Settle plates are a non-validatable method as it is simply based on the physical principle of the downfall of a particle on a surface. We discuss the using active air sampling versus passive air settle plate monitoring in routine environmental monitoring.
-
Considerations & Steps For Building A Contamination Control Strategy (CCS)
9/30/2021
Defining a Contamination Control Strategy (CCS) is unique for each process and requires an intimate understanding of both the process and how to implement an effective strategy.
-
Modular Facilities - The Proven Response For Rapid Biomanufacturing Anywhere
9/28/2021
Select one of the flexible, prefabricated cGMP biomanufacturing environment with a configurable production line that future-proofs capacity expansion, improves operational efficiency and minimizes infrastructure to begin manufacturing faster for a fraction of the cost.
-
Best Practices On Health-Based Cleaning Limits In A Multiproduct Facility
7/27/2021
A discussion on translating the allowable daily exposure (ADE)/permitted daily exposure (PDE) limits into analytical cleaning limits and using the cleaning limits on a daily basis for multiple equipment trains.